Tuesday 20 February 2018

January



The heating system has gone in, it  quite unique, but should be very efficient.
It is a combination of wood burning stove, accumulator tank and PV panels. The wood burning stove with a back boiler feeds the accumulator tank which is 1000 litres, storing the water at 85 degrees this will be used to provide the hot water for the heating system and the domestic hot water cylinder through a coil in the 300 litre cylinder which is in the house, in a similar way to a conventional gas boiler and hot water cylinder.This will be used during the winter months, the wood-burning stove is not a feature of the main Living Space, (but is in the garage) as it would generate too much heat and will overheat the house. The house will need approximately  one kilowatts of heating for the entire house when it is 10 below outside.
During the summer months the PV panels on the roof will heat the hot water cylinder which is in the house via the immersion heater and a bit of smart technology called, i boost box. This monitors the power being generated by the PV panels and when we are exporting power to the National Grid it switches on the immersion heater on to make hot water. This enables us to use 100% of the power but still get paid for the 50% they assume goes into the grid.

Other work that has been going on is all the pipe work for the 2 towel rails and one radiator these are all having to run very carefully to keep the pipe runs short but also to enable pipe insulations to go around the pipes as it in insulated pipes could cause the house to over heat.

MVHR. This is one of the fundamental parts of passive house. The basic concept. Build tight so no air can get out and ventilate right. So will be recovering all the heat from  hot areas of our house so the bathrooms and the kitchen the will then do into the MVHR unit which is heat exchange unit that recovers the heat from that air as it expels from the house and adds it to the fresh air as it comes in. Where in normal buildings we just pump all the hot air from bathrooms and kitchen out of the house.




























December

December was about filling the gap between the house and the garage so we could get the floor ready to cast in the garage for the work to happen in January.
Also we had a bit of snow which was not too much of a challenge as we had work to do in on the inside and which was adding the airtight smart ply.










Sunday 18 February 2018

Drone photos from Chris

This Blog post is thanks to Chris Naylor for Bring his Drone down for the weekend and taking a load of pictures.  It is amazing to see the site from above.
they are little out of date now but does show how far we have come since August last year.